- PAD: Oak » »
- « « PAD: Pumpkin
Monday, November 8, 2010
Quilt: Day Two
Today I (hopefully) finished up the green squares.
I might have been able to start on the purple, except that I ended up repeatedly ripping out seams because the tension was screwed up. (This was not actually my fault: I played with the tension, stitch length, changed the material, changed the bobbin, and then finally discovered the thread was miswound and that was screwing up the tension. BAH.
But, it’s the process, and with that in mind I didn’t get frustrated. (YAY ME!)
Here’s the process so far:
This is not how the green is going to be laid out in the quilt, but I wanted to get an idea of how the pattern was going to look. Michael helped me tweak the layout to get it to do what I wanted, but I think this is (generally) the layout for the end result.
Unless I change my mind.